Logo Pharmaplan

bioMérieux– Medical diagnosis capacity increase

bioMérieux– Medical diagnosis capacity increase As part of their growth strategy, bioMérieux needed to increase their production capacity for cartridge refilling. At first, they considered 2 different scenarios: construction of a new building, or redevelopment of existing premises. bioMérieux thus looked for a partner who could help determine the best solution and subsequently execute it. […]

RIOM2 – Greenfield injectables facility

CARBOGEN AMCIS – GREENFIELD INJECTABLES FACILITY CARBOGEN AMCIS, pharmaceutical company dedicated to clinical development including API and drug product manufacturing,  is building a new 9,500 square meters facility dedicated to injectables. These new premises will enable CARBOGEN AMCIS to enlarge their services portfolio notably with complex formulation using various chemical and biological agents. Pharmaplan designed […]

F. Hoffmann-La Roche AG – pRed

F. Hoffmann-La Roche AG – pRED The project consists of two high-rise buildings (building 6 and 7) housing flexible and state-of-the-art laboratories for life science and pharmaceutical chemistry with an associated office zone for 1,800 researchers. Furthermore, a conference and an office building belong to the project. The four buildings share a common basement with […]

Protinus

CSL BEHRING AG – PROTINUS With Pharmaplan as general design contractor, construction management, commissioning & qualification lead, CSL Behring is expanding its production capacity to keep up with global demand for its market-leading immunoglobulin products. The new building accommodates two additional manufacturing lines for immunoglobulin products. This extension is a multi-story building with three basement […]

Capacity increase & ergonomics and process efficiency improvement

DSP SAS, GROUPE DUPONT– CAPACITY INCREASE & ERGONOMICS AND PROCESS EFFICIENCY IMPROVEMENT DSP SAS is producing ionic exchange resin (IER) at Chauny site. This production is partially used in the pharmaceutical industry as API or excipient. The purpose of the project was to increase production capacity by adding a second dryer (fluid bed technology) and […]

F²VE – Greenfield veterinary vaccines

BOEHRINGER INGELHEIM ANIMAL HEALTH – GREENFIELD VETERINARY VACCINES FACILITY Boehringer Ingelheim Animal Health needed a new large-scale facility for formulation and filling of inactivated virus vaccines for farm animals. The new facility is three levels and a total of 6,000 square meters. It includes a formulation area, high complexity transfer and CIP/SIP systems, an aseptic […]

Pegasus III – Medical device capacity increase

ALLERGAN – MEDICAL DEVICE CAPACITY INCREASE In order to increase capacity (25% growth/year – target 14 million packs), Allergan planned to revamp and extend its existing medical device manufacturing plant in France. The overall project is approximately 4,000 square meters. For this purpose, Allergan developed a conceptual design and then looked after the services of […]

B098 IVR

F. Hoffmann-La Roche AG – B098 IVR One of the equipment innovation highlights is the modular laboratory concept which allows individualized reconfiguration of the animal holding and study rooms within two weeks including a completely automated decontamination. Pharmaplan has been the general design contractor of this highly automated laboratory facility with focus on flexibility, functionality, […]

Boehringer Ingelheim Pharma GmbH & Co. KG

Boehringer Ingelheim Pharma GmbH & Co. KG – New solids launch facility The pharmaceutical company Boehringer Ingelheim Pharma GmbH & Co. KG wanted to establish a new central launch and production facility with containment requirements (OEB4) within the Boehringer network in Ingelheim. The new facility should on the one hand be highly flexible and modular […]

New Fast Track OSD facility

BOEHRINGER INGELHEIM AM RHEIN PHARMA GMBH & CO. KG – NEW FAST TRACK OSD FACILITY The pharmaceutical company Boehringer Ingelheim am Rhein needed a partner who would help them design and build an OSD production facility in a given time frame of just 18 months – from the first sketch until the start of a […]